Testing by Vanguard Laboratory · Olympia, Washington360-967-7010

Metals & inorganic panels

EPA 200.8 water analysis

EPA 200.8 project analysis: review the target scope, sample context, reporting basis and collection requirements.

Metals by ICP-MS (EPA 200.8 and 6020B) measurement context

Inductively coupled plasma mass spectrometry. Atoms in the sample are ionized in an argon plasma, and the ions are separated and counted by their mass; it is used when lower concentrations need to be measured. Elements we test: aluminum, antimony, arsenic, barium, beryllium, cadmium, chromium, cobalt, copper, lead, manganese, molybdenum, nickel, selenium, silver, thallium, vanadium and zinc, singly or as a scan. Zirconium is also measured by ICP-MS using the EPA 200.8 procedure. Water results are reported as µg/L. Solid samples are tested by EPA SW-846 Method 6020B.

Lead and copper for schools and child care measurement context

First-draw samples from drinking-water outlets in schools and child care facilities, tested for lead and copper. Sampling follows your state program or the EPA 3Ts guidance.

Define the element list and fraction

Name the elements and state total, total recoverable or dissolved preparation as required. Filtration and preservation belong in the collection plan, and reporting limits must support the project criteria.

Include the complete project requirement

Provide the matrix, target analytes, required method, fraction, units and reporting limits. Include the permit or monitoring instructions where results will support a regulatory submission. Naming this method does not establish blanket compliance eligibility.

Resolve collection before sampling

Use the bottle, preservation and delivery instructions assigned to the agreed scope. Identify each location and collection time, and document any deviation. The final analytical plan must fit the submitted material and its intended use.

Related testing & guidance

Technical & service references

Vanguard service details

Source review: November 8, 2026. The agreed method and project scope govern the testing.

Start with a defined scope

Build a project scope

Tell us the sample, the question and the decision your results need to support.

Build a testing request