Testing by Vanguard Laboratory · Olympia, Washington360-967-7010

Metals & inorganic panels

EPA 200.7: Metals by ICP-OES (EPA 200.7 and 6010D)

Scope EPA 200.7 for metals by icp-oes (epa 200.7 and 6010d). Define sample matrix, preparation, reporting limits and project requirements.

Metals by ICP-OES (EPA 200.7 and 6010D) measurement context

Inductively coupled plasma optical emission spectrometry. The sample (acid digested for total recoverable metals) is sprayed into an argon plasma, where each element gives off light at its own wavelengths, and the intensity of that light is measured against calibration standards. Elements we test: aluminum, antimony, arsenic, barium, beryllium, boron, cadmium, calcium, chromium, cobalt, copper, iron, lead, lithium, magnesium, manganese, molybdenum, nickel, phosphorus, potassium, selenium, silver, sodium, strontium, thallium, tin, titanium, vanadium and zinc, singly or as a scan. Sulfur and silicon (reported as silica if required) are run by the same ICP-OES procedure. EPA 200.7 is the water method; 6010D is the EPA SW-846 method for wastes and other samples. Mercury is measured by cold vapor (below). Reported as mg/L.

Define the element list and fraction

Name the elements and state total, total recoverable or dissolved preparation as required. Filtration and preservation belong in the collection plan, and reporting limits must support the project criteria.

Include the complete project requirement

Provide the matrix, target analytes, required method, fraction, units and reporting limits. Include the permit or monitoring instructions where results will support a regulatory submission. Naming this method does not establish blanket compliance eligibility.

Resolve collection before sampling

Use the bottle, preservation and delivery instructions assigned to the agreed scope. Identify each location and collection time, and document any deviation. The final analytical plan must fit the submitted material and its intended use.

Related testing & guidance

Technical & service references

Vanguard service details

Source review: November 8, 2026. The agreed method and project scope govern the testing.

Start with a defined scope

Build a project scope

Tell us the sample, the question and the decision your results need to support.

Build a testing request